BWMN vs CDLR

Bowman Consulting Group Ltd. vs Cadeler A/S — Valuation Comparison 2026

BWMN

Engineering & Construction
Bowman Consulting Group Ltd.
Quality
8.5
out of 10
Value Trap
35
LOW
Price
$32.79
Last close
Models
12/13
Active
VS

CDLR

Engineering & Construction
Cadeler A/S
Quality
7.3
out of 10
Value Trap
44
WARN
Price
$25.65
Last close
Models
12/13
Active

Model-by-Model Comparison

ModelType BWMN Fair ValueBWMN Upside CDLR Fair ValueCDLR Upside
Bayesian DCF Intrinsic $8.43 -74.3% $21.29 -17.0%
Earnings Power Value Intrinsic $3.23 -90.1% $40.39 +57.5%
EROIC Spread Intrinsic $•••.•• ••.•% $•••.•• ••.•%
First Chicago Scenario $•••.•• ••.•% $•••.•• ••.•%
Markov DDM Intrinsic $•••.•• ••.•% $•••.•• ••.•%
ML-RIV Intrinsic $•••.•• ••.•% $•••.•• ••.•%
Dynamic NAV Asset-Based $•••.•• ••.•% $•••.•• ••.•%
PWERM Option-Based $•••.•• ••.•% $•••.•• ••.•%
Regime Cross-Sectional Relative $•••.•• ••.•% $•••.•• ••.•%
Sentiment SOTP Hybrid $•••.•• ••.•% $•••.•• ••.•%
CUCE Ensemble Ensemble $•••.•• ••.•% $•••.•• ••.•%
FTNN Topology Relative $•••.•• ••.•% $•••.•• ••.•%
RCMH-DCF Intrinsic $•••.•• ••.•% $•••.•• ••.•%
🔒

Unlock Full 13-Model Comparison

Access all valuation models for BWMN vs CDLR — including EROIC Spread, First Chicago, Markov DDM, PWERM, and 7 more.

Access Full Analysis — From $27/mo →

BWMN vs CDLR — Which Stock Is More Undervalued?

BWMN scores higher with a 8.5/10 quality rating vs CDLR's 7.3/10. Both stocks are analyzed daily using SEC EDGAR filings across 13 independent models.

Comparing Bowman Consulting Group Ltd. (BWMN) and Cadeler A/S (CDLR) across 13 institutional-grade valuation models reveals how each company's intrinsic value stacks up against its market price. CirclFi's engine processes SEC EDGAR 10-K and 10-Q filings, FRED macroeconomic data, and GDELT news sentiment to generate independent fair value estimates daily.

BWMN currently trades at $32.79 with a QOC of 8.5/10, while CDLR trades at $25.65 with a QOC of 7.3/10.

Both companies are analyzed with models spanning intrinsic (Bayesian DCF, EPV), scenario-based (First Chicago), regime-switching (Markov DDM, RCMH-DCF), machine learning (ML-RIV, FTNN Topology), and ensemble methods (CUCE).