BLD vs BLNK

TopBuild Corp. vs Blink Charging Co. — Valuation Comparison 2026

BLD

Engineering & Construction
TopBuild Corp.
Quality
9.8
out of 10
Value Trap
18
SAFE
Price
$420.68
Last close
Models
12/13
Active
VS

BLNK

Engineering & Construction
Blink Charging Co.
Quality
5.5
out of 10
Value Trap
24
SAFE
Price
$0.84
Last close
Models
12/13
Active

Model-by-Model Comparison

ModelType BLD Fair ValueBLD Upside BLNK Fair ValueBLNK Upside
Bayesian DCF Intrinsic $420.57 -0.0% $0.35 -58.4%
Earnings Power Value Intrinsic $187.19 -55.5% $0.22 -70.0%
EROIC Spread Intrinsic $•••.•• ••.•% $•••.•• ••.•%
First Chicago Scenario $•••.•• ••.•% $•••.•• ••.•%
Markov DDM Intrinsic $•••.•• ••.•% $•••.•• ••.•%
ML-RIV Intrinsic $•••.•• ••.•% $•••.•• ••.•%
Dynamic NAV Asset-Based $•••.•• ••.•% $•••.•• ••.•%
PWERM Option-Based $•••.•• ••.•% $•••.•• ••.•%
Regime Cross-Sectional Relative $•••.•• ••.•% $•••.•• ••.•%
Sentiment SOTP Hybrid $•••.•• ••.•% $•••.•• ••.•%
CUCE Ensemble Ensemble $•••.•• ••.•% $•••.•• ••.•%
FTNN Topology Relative $•••.•• ••.•% $•••.•• ••.•%
RCMH-DCF Intrinsic $•••.•• ••.•% $•••.•• ••.•%
🔒

Unlock Full 13-Model Comparison

Access all valuation models for BLD vs BLNK — including EROIC Spread, First Chicago, Markov DDM, PWERM, and 7 more.

Access Full Analysis — From $27/mo →

BLD vs BLNK — Which Stock Is More Undervalued?

BLD scores higher with a 9.8/10 quality rating vs BLNK's 5.5/10. Both stocks are analyzed daily using SEC EDGAR filings across 13 independent models.

Comparing TopBuild Corp. (BLD) and Blink Charging Co. (BLNK) across 13 institutional-grade valuation models reveals how each company's intrinsic value stacks up against its market price. CirclFi's engine processes SEC EDGAR 10-K and 10-Q filings, FRED macroeconomic data, and GDELT news sentiment to generate independent fair value estimates daily.

BLD currently trades at $420.68 with a QOC of 9.8/10, while BLNK trades at $0.84 with a QOC of 5.5/10.

Both companies are analyzed with models spanning intrinsic (Bayesian DCF, EPV), scenario-based (First Chicago), regime-switching (Markov DDM, RCMH-DCF), machine learning (ML-RIV, FTNN Topology), and ensemble methods (CUCE).